In order to accelerate infrastructure development in Indonesia, IIGF is actively involved in the development of infrastructure projects both owned by central and province/municipal government to be planned and developed through PPP scheme (Public Private Partnership).

Here is a list of potential infrastructure projects currently supported by IIGF:

  • Jakarta Cikampek II Eleveted Toll Road

    22 February 2017

    The toll road project of Jakarta Cikampek II Eleveted is 36.4 km with an estimated investment value of IDR 14,7 trillion. This Toll Project is a project with a PPP scheme and is a toll project awarded by the Government Guarantee through IIGF as a...

  • Cileunyi – Sumedang - Dawunan Toll Road

    22 February 2017

    The 60.2 km Cileunyi - Sumedang - Dawunan toll road project with an estimated investment value of IDR 8.2 trillion. This Toll Project is a project with a PPP Scheme and is a toll project awarded by the Government Guarantee through IIGF as a singl...

  • Krian – Legundi – Bunder - Manyar Toll Road

    22 February 2017

    The Krian - Legundi - Bunder - Manyar toll road project is 38.2 km long with an estimated investment of IDR 9.2 trillion. This Toll Project is a project with a PPP scheme and is a toll project awarded by the Government Guarantee through IIGF as s...

  • Serang - Panimbang Toll Road

    22 February 2017

    The toll road project of Serang - Panimbang along 83.9 km with an estimated investment value of IDR 5.3 trillion. This Toll Project is a project with a PPP Scheme and is a toll project awarded by the Government Guarantee through IIGF as a single widow policy.

  • Palapa Ring Project - East Package

    29 September 2016

    The Palapa Ring project is one of the backbone network development projects designed and implemented using the Marine Cable Communication System and Fiber Optic Communication System to 57 underserved cities / districts. The Palapa Ring project was developed by the Ministry of Communications and I...

  • Umbulan - East Java Drinking Water Project

    21 July 2016

    The limited supply of clean water in the main regions of East Java area, such as Surabaya, Sidoarjo, Gresik, Pasuruan and Pasuruan city has led the East Java provincial government to initiate a drinking water supply system (SPAM) project to distibute drinking water from Umbulan spring in Pas...

  • Central Java Power Plant Project

    09 June 2016

    The Central Java Power Plant project is a 2 x 1,000 MW coal-fired power plant in Batang Regency, Central Java. The power plant facility valued US$ 4 billion or more than Rp40 trillion, will be developed by PT Bhimasena Power Indonesia (BPI) consortium under a Build-Operate-Transfer scheme with a ...

  • Pandaan - Malang Toll Road

    09 June 2016

    Pandaan-Malang toll road is part of North-South line corridor plan in East Java Province as a repercussion of Gempol-Pandaan toll road along 37,62 km. This toll road will traverse three important areas in E...

  • Batang - Semarang Toll Road

    09 June 2016

    The Batang-Semarang Toll Road with a total length 75 kilometres and worth IDR 11 trillion connects Merak, Banten up until Banyuwangi Jawa Timur. This road developed as a part of Trans Java Toll road.

  • Manado-Bitung Toll Road

    09 June 2016

    Manado-Bitung toll road project located in the region of North Minahasa and the city of Bitung. Based on Presidential Decree No.32 year 2011 of the Masterplan for the Acceleration and Expansion of Indonesian Economic Development 2011-2025, port of Bitung will be developed into a port of export-im...

  • Balikpapan-Samarinda Toll Road

    09 June 2016

    Balikpapan-Samarinda toll road located in the administrative region of Balikpapan, Kutai Kartanegara regency and Samarinda. Samarinda and Balikpapan are cities with high population density where Samarinda i...

  • Palapa Ring Project - Western Package

    01 April 2016

    “Palapa Ring” project is the development of backbone network project designed and implemented using submarine fiber-optic cable system to cover 57 city/district where some are still underserved. This project is one of National Strategic Infrastructure Projects as stated in Presidentia...

  • Palapa Ring Project - Central Package

    04 March 2016

    “Palapa Ring” project is the development of backbone network project designed and implemented using submarine fiber-optic cable system to cover 57 city/district where some are still underserved. The procurement of were divided into 3 (three) main packages; the Western, Central, and Ea...